Showing posts with label Anderson Construction. Show all posts
Showing posts with label Anderson Construction. Show all posts

Monday, February 7, 2011

Done!

The stucco is done! It looks beautiful! These pictures are from tonight at 5:45 pm (they finished about 3:45). It still needs to dry a bit, but man, it's exciting.
The garage
The master bath door (eventually a pool bathroom door)
The left side of the bathroom and dressing area addition
and the view from the garage
As Dave says, "it looks like a new house."
I LOVE Anderson Construction and everything they've done for us
(check them out at www.acsi-ca.com)

Friday, February 4, 2011

Loving this

When I woke up this morning, the outside of the Red Room looked like this.At 6:45 am, the contractor and stucco guys showed up and started banging around... We added a bit of stucco work for the garage (the new window and door were replaced in Jan of 2009, but the stucco stayed yucky).
The back side of the master bath is also being stuccoed at the same time (there use to be green paneling here, causing major heat loss). The small window is new as part of the master shower. The bigger window was already there. In the far left corner where you see brown--yeah, that use to be a piece of glass that let bugs into the house in the "sink" room.
When I came home today, I found this...
After the next two days of "drying," they will return back on Monday for a color coat on all three areas. After the color coat, we can final close the permit on the master bath addition and all the back of the house will at least be all white.

Wednesday, February 2, 2011

Speedy, Speedy

When I left the house yesterday, the red room looked like this.
Dave's fantastic electrical work was evident and so were all the studs.
When I returned last night after work, a Read 180 meeting, and dinner with Susannah, the Red Room looked like this...

The reason you see "unfinished" wall is because the unfinished wall will be eliminated completely, but we didn't want to eliminate it completely now because there are cabinets and a dishwasher on the other side of it in the kitchen.

The pure luxury of being able to hire a contractor to do this type of work is speed! Although Dave can do the work as stellar as the professionals, he can't beat their efficiency. By Friday of this week, the final sanding will be finished and the outside will be stuccoed. Rest assured, more progress pictures will be coming :)

Sunday, January 30, 2011

Weekend at the Pfeffers

We spent an huge amount of time in the red room! In order for the contractor to finish the room this week (yes, the entire project will be done in two weeks!!!), Dave had to get the electrical work done. Dave has probably saved us about $1500 by re-wiring everything himself.

This includes:
  • all new junction boxes under the house and in the rafters (to help the whole house re-wire later)
  • eight outlets for living room, dining room, kitchen, and outside
  • overhead light and three way light switch for it
  • two outside porch lights with a switch inside
He learned a great deal of the electrical when he did it for the master bath addition and knew he was doing it correctly because he passed his city inspection with flying colors. This weekend, he has spend a fair share of time in the rafters, in the room, outside, and under the house. The part that makes him VERY cranky is the time he had to spend under the house. Although he does get to wear this spiffy suit and LED light on his head, he doesn't enjoy crawling around in the rocks, dirt, and mud. Just today he spend two hours, twelve minutes under the house (I didn't think to keep track yesterday). While he is under the house, it is my job to stay in the house and do what he says from up above. This involves a whole lot of waiting for him while entertaining the dog and a little big of actually helping. On the Reese note, she really doesn't like him under the house either. She constantly looks down the wire holes because she can see/smell/hear him and whines until she gets picked up.
My "big" job of the weekend was to run all the wires down the holes to Dave. From there he hooked them into the new "j-box" and I then cut them and started the process over in another one of the holes. I, of course, messed one of them up which was a bit stressful, but Dave figured out how to make my mistake work.

Oh, and while he was under the house last night, he found a small gas leak... which he fixed in his time under there today. I know what you're thinking, "how in the world does he know how to do these things?" I think the same thing often; he has a gifted brain.

No nursery work has happened (completely understandable) on Dave's end, but I was able to get several smaller projects done while I was "on call." I added ribbon to my mom's art work to "finish" them. I also added brown bows to my baskets to go with the theme. After poring over the giant Behr paint color wheel, I also picked the four colors we'll use for the walls. Baby clothes from Tawni are being sorted and put away now too!
baskets from the changing table shelf

Technically, the nursery wasn't suppose to be started until next weekend anyway. So we aren't "behind" schedule. Also, today I am 31 weeks pregnant, only 9 weeks to go!

Wednesday, January 26, 2011

Red Room Under Construction

See this wall?
This is the outside wall of the Red Room. The cement under the sliding doors is crumbling and the doors are slightly "bending" into middle. The previous owners had broken out the step and part of the foundation to add in the ugly deck that we took out when we moved out...
Although this picture was taken yesterday, it might as well have been from November 2009. The room hasn't changed in anyway since before we bought the house. We've used the room as storage for construction (remember the toliet living in the room?), storage for our house, and sort of as a dining room.

Because we are not foundation experts, nor does Dave have time to start another major project before Drew gets here, we've hired a contractor to fix the wall and then finish the room (new installation and drywall).

After one day, the team of contractors finished demo of the room and cleaned up EVERYTHING. I love this :)
This is the wall between the Red Room and living room with plastic preventing dust from moving around our clean house.
More to come as progress is made :)