Tuesday, October 20, 2009

Master Bath Remodel, Part III

The rough stucco coat in on and drying...
The door is looking great, Dave added an outside light and outside outlet. Vents have been added to help with the heating/cooling issues we experienced last winter and summer. The steps are set and we have the "outside" done for now.

Dave taught himself how to complete all the rough plumbing and passed inspection from the city. This is all the hot/cold water pipes, drains, and drain exhaust (white cap) for our new double sinks. They even work :)

Inside the room, the rough electrical is installed and ready. Insulation has been put inside the exterior walls. The "wall" directly in front of this picture is blocking the master bedroom from the dirt and cold coming from the exposed floor.