Showing posts with label Home. Show all posts
Showing posts with label Home. Show all posts

Sunday, July 1, 2012

Portland, Day 8 (coming home)

 Wednesday morning, we packed out stuff and headed home.  We were all pretty exhausted and Andrew showed it (he slept through the dropping off the rental car, riding the shuttle to the airport, and check-in).  Getting home was pretty uneventful (much like getting there); the only excitement was that TSA had to search through our stuff because we had an 8 oz pedisure for Andrew.  On the way there, out of Long Beach, they just had to do a pat down of the parent (they did that in Oregon too).

 Andrew waved bye-bye and said bye about 100 times as we boarded, taxied and took off.  It was pretty cute.
There was a group of business-looking travelers in front of us on the very full plane and I was a bit worried that we were going to bother them.  Andrew has a habit of hitting/kicking the chair in front of him so we tried to be careful.  At the end of the flight, one of the men turned around and commented on how well-behaved Andrew was during the flight.  He commented on his large vocabulary (huh?), his calm demeanor, and his ability to be relatively quiet for so long.  It was nice to hear :)

Saturday, April 2, 2011

Toliet Paper Snob

thats me.

I care what kind, what softness, what thickness, etc. I have "high standards" as to what is going to touch my skin. This toilet paper thing started when I was little and, thankfully, my parents trained us that good toilet paper was of the utmost importance.


Needless to say, I have created another toilet paper snob--Dave. We're a Charmin, Ultra Soft, Jumbo Roll household. I don't care what is on sale, or what I have a coupon for, it is always the same (and has been since I began buying my own toilet paper in 2002).


But get this--I bought the wrong kind at the store this week! HOLY COW, pregnancy brain is real! And an open toilet paper package is NOT returnable.


(The world is not completely over, it is still Charmin--Charmin, Ultra Strong, Jumbo Roll)

Friday, January 7, 2011

Year Two of Homeownership

Last year I had a pretty impressive blog about the First Year of Homeownership and showed off all the changes that had taken place in our house; this year, at lot less has been accomplished on the remodel because of all those busy things that happened and the onset of a JOB (woo hoo!!) for Dave. However, December 31st was still our second year of homeownership! Enjoy a photo tour!

First off, those with a change:
  • Guest Bedroom: Year 1 and 2In April when Melissa moved in, the guest bedroom transformed into her room. Other than the major roommate change, the closet was also given a facelift with custom made sliding mirror doors. Jennifer slept in the guest bedroom with Melissa until July 1 as Dave slept in the red room on the mattress--now that was interesting.
  • Hallway: The bathroom and master bedroom door trims were finally finished. The linen closet and drawers were finally made useable and more pictures were hung on the wall.
  • Master Bedroom: (Year 1 and 2) BIGGEST TRANSFORMATION of the year and about the same cost as everything from 2009 (because as much as I planned and tried to get Dave to stick with it, 101 small trips to Home Depot caught up with us)
  • The bedroom itself has repaired plaster and new drywall, painted and cleaned closet with new custom doors, new paint, and our bedroom set in June.
  • The area behind the plywood from the 2009 picture and the original "sink room" is now transformed into my closet/dressing area with all new studs, floorboard, heating/air conditioning, electrical, dimming can lights, drywall, closet cabinets from Ikea, and paint to match the bedroom. Enjoy the magic of my closet!
  • The bathroom is still not quite done, but also has new everything like the dressing area AND a new shower pan, tile floor and shower, toliet and vanity. Still needs a countertop, sinks, and all the fixtures.
And those things with no changes:

  • Front of the House: The wonderful grass is still super green and the envy of all the neighbours! Dave is still rather obsessed with it :).
  • Living Room: Still beautifully mocha and exactly how I had it envisioned, although usually it has too much stuff in it that either Dave, Melissa, or I do not put away.
  • Office: Although there were plans to fix this room this year (changing the door, moving in the futon), it is the same messy room. It has acquired another four computer CPUs, several hundred dollars worth of textbooks and more mess.
  • Kitchen: literally looks exactly the same as 365 days ago, Christmas decorations and all.
  • Red Room: the bunnies moved to the garage and instead of construction storage, the room has become baby storage area. We have my parents dining room table and china hutch sitting there too. The wall with the beautiful sliding doors must be our next project (that we'll pay to have done) because the concrete under it is crumbling.
  • Hall Bathroom: Beautiful as remodeled--still the room I sit in when I need a rejunivation from the state of undoneness of my house(baby projects finished in February of 2010).
  • Backyard: construction zone (or lack there of) for the year.
2011 Projects (in order of my priority and all hopefully done BEFORE Drew arrives):
  1. Master bathroom finished (as I type this Dave is outside cutting the final pieces of tile)
  2. Guest bedroom door replaced
  3. Guest bedroom transforms into nursery
  4. Red Room wall taken down, foundation fixed (welcome contractor again)
  5. Red Room drywall repaired, textured, painted
  6. Red Room floor level and new floor laid

Wednesday, March 3, 2010

Master Bath Budget Planning

As we put the master bathroom back together, I am determined that we'll keep the spending within our small budget and know, at all times, the exact amount of money that we've spent and how much we have left.

This has been one of our biggest issues as we've been working room by room. Because of 1,000 small trips to Home Depot (sometimes multiple times a day), I really couldn't tell you how much we spent on the front bathroom because the expenses are spread around the ATM, Credit, Cash, gift cards, etc...

Most of the issue has been that we had no idea what we're going to need until we need it and planning ahead is my strength, not Dave's. As you read about here, here, here, and here this room has already been started and $6,000 has already been spent on the exterior wall and rough plumbing and electrical.

As I showed you a few days ago, we're now ready to move onto the next stage of the project which is putting the floor, walls, and new ceiling back together.

This project has a couple good things going for it in the money department.
  1. We've put a bathroom together before, so Dave knows a lot more of the "unexpected costs" so they can now become expected costs.
  2. I know that I need to be instrumental in the planning and I've learned A LOT watching him and Homes on Homes (love that show).
  3. There aren't 101 projects going on at the same time; the distractability is dramatically decreased.
  4. We have a firm budget of $1,600 and it is cash in-hand. We don't have any money other than that to go "over" into like last time when there was a giant chunk of cash (sadly, the giant chunk was a lot more fun).
  5. We have a firm deadline of April 7. His parents will be here the next day for his graduation and his motivation to have it done is high.
  6. After yesterday, he has one class period to attend and one final to take, and he is completely done with school!!

Where do we start this magical budgeting planning process?

For the past two weeks, I've been asking Dave to tell me what he needs to do and in what order to get him pre-thinking about it. I've been taking notes.

Saturday, I sat him down with my excel spreadsheet ready with everything he's told me and we added a lot more of the parts of the process.Home Depot was our next step. We spent two hours walking around, writing down the costs and correctly estimating how much of everything we needed. We even added a few things we'd forgotten. The first "brainstorm" list then transformed into a budget speadsheet, subtotaled into the main categories of this stage of the project (HVAC, Structural repairs, Insulation, and Drywall/Shower Inclosure). Adding Riverside's 8.85% sales tax and a 15% overage opps fund (according to Homes, this is standard for all contractors), we're budgeted at $1,660.11

I think our month budget can absorb $60.11.

This Saturday, we'll be going to Home Depot and purchasing this shopping list! And there will be $100 petty cash in our money box in case of an emergency Home Depot run...

Friday, January 1, 2010

Looking forward to 2010

Exciting things I'm looking forward to, by the month, during 2010
  • 1-Class only on Saturdays with my favorite professior
  • 2-Reaching 50 workouts at Curves and earning my ladybug
  • 3-Dave graduating with his BA in Network Security (God, please make a job for him)
  • 4-Hearing the results of the 2009 CSPA yearbook crown competition
  • 5-Rachel's baby boy is coming for a visit
  • 6-Graduating in June with my MA in Educational Leadership (God, please remind me that I don't want to get a Ph.D during this process)
  • 7-Both Dave and I being done with school and home together in the evening for the first time in our marriage, vacation?!?
  • 8-Four years of marriage and Robyn's baby is coming (God, please make it a girl)
  • 9-Starting back to school with a new assignment (God, please make Yearbook happen)
  • 10-Officially being "old" at 27
  • 11-Melissa's birthday and...
  • 12-Dave turns 29, CHRISTmas, vacations, 2011

Of course, there are some things that don't "fit" into the months because I have no idea when they'll happen;

  • Dave getting a good job in his computer field which makes him happy (Selfishly: perferably one making a good salary)
  • Dad going to a church that will uplift him and allow his serve God (Selfishly: perferably in SD or closer to me)
  • Melissa finding the perfect RN job for her in a place that she'll learn and meet the perfect cute doctor
  • Mom getting to keep her El Cap job for as long as they need it and if they do have to move that she'll adjust in her powerful fashion
  • Spending time with my friends and being a part of their ever growing families as they celebrate love, pregnancy, babies, etc.
  • The house moving towards completion (notice I didn't say "complete," I am not that unrealistic) as the money and time is provided through our hard work

Thursday, December 31, 2009

One Year of Homeownership

One year ago today we officially closed escrow on our home. We had already been working on the house for a few days (with Dad's help), trying to get it move-in ready. The call came as I was standing on the kitchen counter scrubbing dead bugs out of the kitchen cabinets already thinking "what did I get myself into?"

This year has been filled with those kind of moments--the never ceasing dust, the increasingly high amount of money we've spent, the always appearing dead, stuck-on bugs, the months of unfinished projects, and the overwhelming exhaustion of working constantly.

In October, when all of our friends were over carving pumpkins and making carmel apples it felt like our "home" for the first time and I was happy. This Christmas with the decorations up and the lights shining, it felt like it was all worth it.

I am incrediably proud of my husband who has worked hard every day creating the change that you'll see below. Not only has Dave taught himself 101 new things, he has put up with my ongoing pressure to achieve my "home" image! Some rooms you'll notice major changes have already taken place, some minor changes, and some with almost no changes.

Front of the house: replace front door and repair stucco around door, remove bells from above windows, began removing paint from fireplace brick, removed green paint from porch,
remove old sprinker system, add new sprinker system with automatic time and valve manifold and sod
Living Room: removed plaster of paris fireplace, replace front door, repair plaster, textured walls, painted walls and trim, new light sconces, curtains hung
Office: major plaster repair, mailbox elimination, textured walls, paint wall and trim, Dad's custom desk built made and stained, Mom's custom curtains made and hung
Kitchen: bugs removed, cabinets cleaned over and over again, painted everything Swiss Coffee white, removal of gross floor, level/scraped, vinyl floor laid by Dad, curtains hung, mess made (lots more to re-do)
Red Room: room used for storage for seven months, rug added, dining room table and bunnies added (really this room hasn't changed at all).
Front Bedroom: major plaster repair, textured, paint wall and trim, closet scrubbed and cleaned, curtains from Target hung (used as our Master right now)
Hallway: walls scrubbed of dead, stuck-on bugs, painted wall and trim, replaced bathroom door, replaced hardware on linen closet
Hall Bathroom: stripped down to the studs and floorboards, replaced tub, moved toliet six inches, tile floor/wall/shower, vanity/toliet/sink/etc installed
Master Bedroom: nothing itself has changed, added queen bed and paper fold curtains (there is even still bugs on the walls)
Backyard: Removed the desk, dug giant hole for gas and water lines to garage, rototilled ground and laid soil preparing for grass.

Tuesday, October 20, 2009

Master Bath Remodel, Part III

The rough stucco coat in on and drying...
The door is looking great, Dave added an outside light and outside outlet. Vents have been added to help with the heating/cooling issues we experienced last winter and summer. The steps are set and we have the "outside" done for now.

Dave taught himself how to complete all the rough plumbing and passed inspection from the city. This is all the hot/cold water pipes, drains, and drain exhaust (white cap) for our new double sinks. They even work :)

Inside the room, the rough electrical is installed and ready. Insulation has been put inside the exterior walls. The "wall" directly in front of this picture is blocking the master bedroom from the dirt and cold coming from the exposed floor.

Saturday, September 26, 2009

Master Bath Progress

The project keeps rolling along at a super fast pace! Here is the building prepared for stucco, but the real magic was happening inside... The electrical system in our house is old, but when this area was built in 1977 it was done very poorly. Instead of spending the hours to figure out the old system, Dave cut out all the old wires and ran completely new wiring for all the plugs, light switches, and overhead lights and fans. The wiring required significant "learning," caused many frustrating hours for Dave, and required many phone calls to electrical friends.
In the new "dressing area" we have these cool recessed lights with dimmer switches. I eventually hope to use this area as my reading nook with a giant comfy chair.
As part of the electric upgrade of the addition, one day I came home to see this in my kitchen... in order to get the inspector to pass the rough electrical, Dave had to put the new room on its own breaker. This damage occured when he was working with the old (1939) box on the left wall and the newer (1977) box directly in front. No idea why there is a whole in the ceiling. At least when I came home there wasn't too much of a mess, but I still have holes.
Today, Cecilio and his man came over and put the scratch coat onto the outside walls. This is the first coat of the stucco process.
He was going to put another coat (brown coat) on today, but the scratch coat wasn't dry enough. Monday Cecilio will come back and finish his part. At that point, we'll be on our own to finish this addition.
For now, we're going to concentrate on cleaning up the outside (piles of wood pieces, insulation, and cement) and doing one thing at a time when money comes in... and onto GRASS!!

Saturday, May 23, 2009

New Project

I had a plan for a new project. This weekend, while Dave finishes (hopefully) the bathroom, I wanted to build the brick planter that will attach to the garage. I started by laying out my plan and figuring out all of the supplies that I need. My goal is to go to Home Depot ONE time for this project.After my plan was finished, I went outside to start digging my foundation for the three layers of brick wall. Reese came to help.I dug and dug, shoveling rocks out of the area and onto the concrete. I was sweating... yuck... There was about three inches worth of rocks that had to be moved... My online, do-it-yourself research told me that I didn't need a concrete base, but Dave says that I do. He knows what he's talking about, but the bummer is that my project is on hold because I need him to help me cut 2X4s into a concrete mold... and then it has to set up for 4-6 days. No finished product for me; Dave must keep working on the bathroom :)
After my hard work, the area looks like this and is ready for a wood frame and a poured concrete base. The indents you see are were the wall will be.

Tuesday, April 28, 2009

Stressful morning

This morning was stressful.

Overwhelmingly stressful.

It was totally and completely my fault too.


First--Last night I stayed up way too late. After school yesterday I went and received my "salt glow" as part of my spa treatment (more on that later), then went to Target and Walmart, and ended up at home about 7 pm. Desiree came over and we worked on our two assignments for tonight's class. While we were working, Melissa called and then came over with two of her friends to celebrate finishing all her undergrad work (woo hoo, Melissa!!). She came over while Des and I finished our papers. Dave got home at 9:15 and started working away on the bathroom. Everyone left about 10:30 pm and I cleaned the bathroom (tupperware party is Wednesday).

Second--today is the first day of CST testing and I volunteered to coordinate and execute the purchasing snacks for multiple teachers. This morning I got to school at 7 am, hauled cereal for 200 kids for 6 days into my classroom and set it all up for the teachers to come pick it up from the hallway.

Third--I scheduled my parent yearbook camp meeting for this morning at 7:45. I guess when I scheduled it I didn't think about testing, tupperware, Mel's graduation, or anything else, because man, it couldn't be worse timing on my behalf. I have seven parents, my yearbook students, and a few siblings for the 30 minute talk about camp, rules, fundraising and money. The tupperware rep that is running our fundraiser was here and discussed how great of a fundraiser it really is (they get 40% of the sales) and how much money they have the potential for raising. The parents were eager, willing, and wonderful. They left shortly before 8:30.

Fourth--8:30 brought nervous students into my room for the first CST test of the year. We start with Math, so students were extra nervous. I went over some of the basic rules (all of which they already know), passed out cereal snacks and water cups. It is stressful to make sure you're following all the rules because breaking them means tests are invalid.

Overall my students handled the tests well and I had two hours to relax a little from the morning of stress. I'm writing this as they finish 36 basic algebra questions and stress about their little futures. Can I just say that I HATE these tests and the pressure that is put on the kids to do well!! Although that is an entire issue all together.

The week will continue to be busy.
  • Tuesday night: Class
  • Wednesday night: Tupperware party (you're still invited)
  • Thursday night: prepare for all of my entire family to be here
  • Friday day: 1/2 sub for Melissa's pinning, entire family gets here
  • Saturday: Melissa graduates and her party follows

Wednesday, March 18, 2009

A day at home



Trying to kick my sickness away, I spent the day at home. It was interesting... my bunnies crack me up. Darcy is calm and likes to sit... Charlotte never stops moving, and even when she lays down it is only for a short second. She jumps right on top of Darcy. They want to be near each other, but I can't see how he doesn't want to kill her everytime he wakes her up. When they are in their cage, they sleep, when they are outside of the cage, Darcy sleeps and Charlotte jumps!


Charlotte is getting big, but still likes to cuddle. They both think that it is fun to eat plaster off the walls and bite my socks/slippers.
Dave was home working away on the new bathroom. He's doing something with the plumbing and goes from whisling one of three sounds to getting angry every thirty seconds or so... it is interesting to listen to.
My neighbors hang out and talk to each other outside during the day. The mailman (who is very nice) stopped for a cookie and milk with Jake, the two year old who lives on the other side of the street. I've seen four older couples ride their beach cruisers down the street and very, very few cars.