Sunday, July 1, 2012
Portland, Day 8 (coming home)
Saturday, April 2, 2011
Toliet Paper Snob
thats me. Friday, January 7, 2011
Year Two of Homeownership
- Guest Bedroom: Year 1 and 2
In April when Melissa moved in, the guest bedroom transformed into her room. Other than the major roommate change, the closet was also given a facelift with custom made sliding mirror doors. Jennifer slept in the guest bedroom with Melissa until July 1 as Dave slept in the red room on the mattress--now that was interesting.
- Hallway: The bathroom and master bedroom door trims were finally finished. The linen closet and drawers were finally made useable and more pictures were hung on the wall.
- Master Bedroom: (Year 1 and 2)
BIGGEST TRANSFORMATION of the year and about the same cost as everything from 2009 (because as much as I planned and tried to get Dave to stick with it, 101 small trips to Home Depot caught up with us) - The bedroom itself has repaired plaster and new drywall, painted and cleaned closet with new custom doors, new paint, and our bedroom set in June.

- The area behind the plywood from the 2009 picture and the original "sink room" is now transformed into my closet/dressing area with all new studs, floorboard, heating/air conditioning, electrical, dimming can lights, drywall, closet cabinets from Ikea, and paint to match the bedroom. Enjoy the magic of my closet!

- The bathroom is still not quite done, but also has new everything like the dressing area AND a new shower pan, tile floor and shower, toliet and vanity. Still needs a countertop, sinks, and all the fixtures.
- Front of the House: The wonderful grass is still super green and the envy of all the neighbours! Dave is still rather obsessed with it :).
- Living Room: Still beautifully mocha and exactly how I had it envisioned, although usually it has too much stuff in it that either Dave, Melissa, or I do not put away.
- Office: Although there were plans to fix this room this year (changing the door, moving in the futon), it is the same messy room. It has acquired another four computer CPUs, several hundred dollars worth of textbooks and more mess.
- Kitchen: literally looks exactly the same as 365 days ago, Christmas decorations and all.
- Red Room: the bunnies moved to the garage and instead of construction storage, the room has become baby storage area. We have my parents dining room table and china hutch sitting there too. The wall with the beautiful sliding doors must be our next project (that we'll pay to have done) because the concrete under it is crumbling.
- Hall Bathroom: Beautiful as remodeled--still the room I sit in when I need a rejunivation from the state of undoneness of my house(baby projects finished in February of 2010).
- Backyard: construction zone (or lack there of) for the year.
- Master bathroom finished (as I type this Dave is outside cutting the final pieces of tile)
- Guest bedroom door replaced
- Guest bedroom transforms into nursery
- Red Room wall taken down, foundation fixed (welcome contractor again)
- Red Room drywall repaired, textured, painted
- Red Room floor level and new floor laid
Wednesday, March 3, 2010
Master Bath Budget Planning
This has been one of our biggest issues as we've been working room by room. Because of 1,000 small trips to Home Depot (sometimes multiple times a day), I really couldn't tell you how much we spent on the front bathroom because the expenses are spread around the ATM, Credit, Cash, gift cards, etc...
Most of the issue has been that we had no idea what we're going to need until we need it and planning ahead is my strength, not Dave's. As you read about here, here, here, and here this room has already been started and $6,000 has already been spent on the exterior wall and rough plumbing and electrical.
As I showed you a few days ago, we're now ready to move onto the next stage of the project which is putting the floor, walls, and new ceiling back together.
This project has a couple good things going for it in the money department.
- We've put a bathroom together before, so Dave knows a lot more of the "unexpected costs" so they can now become expected costs.
- I know that I need to be instrumental in the planning and I've learned A LOT watching him and Homes on Homes (love that show).
- There aren't 101 projects going on at the same time; the distractability is dramatically decreased.
- We have a firm budget of $1,600 and it is cash in-hand. We don't have any money other than that to go "over" into like last time when there was a giant chunk of cash (sadly, the giant chunk was a lot more fun).
- We have a firm deadline of April 7. His parents will be here the next day for his graduation and his motivation to have it done is high.
- After yesterday, he has one class period to attend and one final to take, and he is completely done with school!!
Where do we start this magical budgeting planning process?
For the past two weeks, I've been asking Dave to tell me what he needs to do and in what order to get him pre-thinking about it. I've been taking notes.
Saturday, I sat him down with my excel spreadsheet ready with everything he's told me and we added a lot more of the parts of the process.Home Depot was our next step. We spent two hours walking around, writing down the costs and correctly estimating how much of everything we needed. We even added a few things we'd forgotten.
The first "brainstorm" list then transformed into a budget speadsheet, subtotaled into the main categories of this stage of the project (HVAC, Structural repairs, Insulation, and Drywall/Shower Inclosure). Adding Riverside's 8.85% sales tax and a 15% overage opps fund (according to Homes, this is standard for all contractors), we're budgeted at $1,660.11
This Saturday, we'll be going to Home Depot and purchasing this shopping list! And there will be $100 petty cash in our money box in case of an emergency Home Depot run...
Friday, January 1, 2010
Looking forward to 2010
- 1-Class only on Saturdays with my favorite professior
- 2-Reaching 50 workouts at Curves and earning my ladybug
- 3-Dave graduating with his BA in Network Security (God, please make a job for him)
- 4-Hearing the results of the 2009 CSPA yearbook crown competition
- 5-Rachel's baby boy is coming for a visit
- 6-Graduating in June with my MA in Educational Leadership (God, please remind me that I don't want to get a Ph.D during this process)
- 7-Both Dave and I being done with school and home together in the evening for the first time in our marriage, vacation?!?
- 8-Four years of marriage and Robyn's baby is coming (God, please make it a girl)
- 9-Starting back to school with a new assignment (God, please make Yearbook happen)
- 10-Officially being "old" at 27
- 11-Melissa's birthday and...
- 12-Dave turns 29, CHRISTmas, vacations, 2011
Of course, there are some things that don't "fit" into the months because I have no idea when they'll happen;
- Dave getting a good job in his computer field which makes him happy (Selfishly: perferably one making a good salary)
- Dad going to a church that will uplift him and allow his serve God (Selfishly: perferably in SD or closer to me)
- Melissa finding the perfect RN job for her in a place that she'll learn and meet the perfect cute doctor
- Mom getting to keep her El Cap job for as long as they need it and if they do have to move that she'll adjust in her powerful fashion
- Spending time with my friends and being a part of their ever growing families as they celebrate love, pregnancy, babies, etc.
- The house moving towards completion (notice I didn't say "complete," I am not that unrealistic) as the money and time is provided through our hard work
Thursday, December 31, 2009
One Year of Homeownership
One year ago today we officially closed escrow on our home. We had already been working on the house for a few days (with Dad's help), trying to get it move-in ready. The call came as I was standing on the kitchen counter scrubbing dead bugs out of the kitchen cabinets already thinking "what did I get myself into?"This year has been filled with those kind of moments--the never ceasing dust, the increasingly high amount of money we've spent, the always appearing dead, stuck-on bugs, the months of unfinished projects, and the overwhelming exhaustion of working constantly.
In October, when all of our friends were over carving pumpkins and making carmel apples it felt like our "home" for the first time and I was happy. This Christmas with the decorations up and the lights shining, it felt like it was all worth it.
I am incrediably proud of my husband who has worked hard every day creating the change that you'll see below. Not only has Dave taught himself 101 new things, he has put up with my ongoing pressure to achieve my "home" image! Some rooms you'll notice major changes have already taken place, some minor changes, and some with almost no changes.
Front of the house: replace front door and repair stucco around door, remove bells from above windows, began removing paint from fireplace brick, removed green paint from porch,
remove old sprinker system, add new sprinker system with automatic time and valve manifold and sod
Living Room: removed plaster of paris fireplace, replace front door, repair plaster, textured walls, painted walls and trim, new light sconces, curtains hung
Kitchen: bugs removed, cabinets cleaned over and over again, painted everything Swiss Coffee white, removal of gross floor, level/scraped, vinyl floor laid by Dad, curtains hung, mess made (lots more to re-do)
Red Room: room used for storage for seven months, rug added, dining room table and bunnies added (really this room hasn't changed at all).
Front Bedroom: major plaster repair, textured, paint wall and trim, closet scrubbed and cleaned, curtains from Target hung (used as our Master right now)Tuesday, October 20, 2009
Master Bath Remodel, Part III
Saturday, September 26, 2009
Master Bath Progress
Saturday, May 23, 2009
New Project
Tuesday, April 28, 2009
Stressful morning
This morning was stressful.Overwhelmingly stressful.
It was totally and completely my fault too.
First--Last night I stayed up way too late. After school yesterday I went and received my "salt glow" as part of my spa treatment (more on that later), then went to Target and Walmart, and ended up at home about 7 pm. Desiree came over and we worked on our two assignments for tonight's class. While we were working, Melissa called and then came over with two of her friends to celebrate finishing all her undergrad work (woo hoo, Melissa!!). She came over while Des and I finished our papers. Dave got home at 9:15 and started working away on the bathroom. Everyone left about 10:30 pm and I cleaned the bathroom (tupperware party is Wednesday).
Second--today is the first day of CST testing and I volunteered to coordinate and execute the purchasing snacks for multiple teachers. This morning I got to school at 7 am, hauled cereal for 200 kids for 6 days into my classroom and set it all up for the teachers to come pick it up from the hallway.
Third--I scheduled my parent yearbook camp meeting for this morning at 7:45. I guess when I scheduled it I didn't think about testing, tupperware, Mel's graduation, or anything else, because man, it couldn't be worse timing on my behalf. I have seven parents, my yearbook students, and a few siblings for the 30 minute talk about camp, rules, fundraising and money. The tupperware rep that is running our fundraiser was here and discussed how great of a fundraiser it really is (they get 40% of the sales) and how much money they have the potential for raising. The parents were eager, willing, and wonderful. They left shortly before 8:30.
Fourth--8:30 brought nervous students into my room for the first CST test of the year. We start with Math, so students were extra nervous. I went over some of the basic rules (all of which they already know), passed out cereal snacks and water cups. It is stressful to make sure you're following all the rules because breaking them means tests are invalid.
Overall my students handled the tests well and I had two hours to relax a little from the morning of stress. I'm writing this as they finish 36 basic algebra questions and stress about their little futures. Can I just say that I HATE these tests and the pressure that is put on the kids to do well!! Although that is an entire issue all together.
The week will continue to be busy.
- Tuesday night: Class
- Wednesday night: Tupperware party (you're still invited)
- Thursday night: prepare for all of my entire family to be here
- Friday day: 1/2 sub for Melissa's pinning, entire family gets here
- Saturday: Melissa graduates and her party follows



