Behind us here you can see the frame. After we built the frame, we mixed one bag of concrete in the handy tub we bought at Home Depot. Then another and another. Three bags that we thought we needed for the whole thing only filled the smaller of the two side.
After the first layer of concrete, we added a metal reinforcement and I pushed it down into the first layer. After that, we added a second layer and pounded it down to get all the air pockets off. We sent Dave to Home Depot to get six more bags of concrete (it was his fastest trip ever, twenty minutes flat).
Here we are with our final product--which has to dry for seven days before I can work on the next part of my project :)
My dad is wonderful!!!
No comments:
Post a Comment